Production plant in Penzberg

Map

New construction of a chemical production plant

Client: Not published
Planning: 2014 - 2016
Construction period: 2015 - 2017
Area: 5.000 m²
Service phases: 1 - 7

A special construction for the manufacture of chemical and biological products is being developed on the site of an international pharmaceutical company in close collaboration with an international plant manufacturer active in the field of processing and finishing of powdered solids for the pharmaceutical and fine chemicals industry.

 

The production building with a full basement and surface area of 37.3 times 23.6 m rises for five full floors with a technical centre on the roof at 33.25 m.

 

The basement, ground floor and first floor include social areas for employees, delivery, a workshop, storage areas and offices. Above there are the production areas, laboratories and clean-room areas. The top floor is the technology floor. The building is equipped with an employee and goods lift at all levels. It is supplied with production media and water, both underground and overground, via the plant media supply. Grey water and process waste-water are discharged separately. The façade is clad in white Alucobond cassettes.